Fort Polk MPDBC
Project: Fort Polk MPDBC
Owner:  US Army Corp of Engineers
General Contractor: Tug Hill Construction
Location: Fort Polk, LA
Date: Fall 2004-Spring 2005
Delivery Method: Sub Contract

Scope of Work:
Constructed over 1300 LF of Multiplate Arch Structures. These bridge crossings were constructed in some very difficult conditions often working below the stream beds. Plate structures were fabricated by Long Span Bridge & Culvert. We constructed over 400 LF of 12” CIP retaining wall that averaged 12’ in height. Installed over 80,000 SF of Armor Flex permanent erosion control mats, manufactured by Contech Construction products. Erected 11 40’ tall steel radio towers used for communication and visual monitoring of the training course.

JCF BRIDGE & CONCRETE, INC.